Deanna
L. Carvalho
mailto:dcarvalho@cookwareinc.net
OBJECTIVE To secure a challenging position in the information
technology field utilizing my project management and quality assurance skills.
EDUCATION Bentley
College, Waltham, Massachusetts
Major:
Computer Information Systems
Bachelor of Science Degree, May 2001
RELEVANT Analysis, Modeling,
& Design; Computer Aided System Engineering; Applied Software Project
CLASSES Management; Object Oriented
Technology; Data Management with SQL; Computer Networks I; Computer Information
Structure; Algorithm & Data Abstractions; Programming Environment-Visual
Basic; Application Development- Visual Basic; Programming in Visual C++; World Wide Web (HTML); Web-Based Graphics
Development; Application Programming I, Application Programming II
COMPUTER Microsoft Office
2000 (Word, Excel, PowerPoint, FrontPage and Outlook); Microsoft Project;
SKILLS Microsoft SQL Server
7.0/2000; Internet Explorer 4.01 and above; Netscape 4.07 and above; Visible
Analyst Workbench; PaintShop Pro 5; Print Shop; Norton Ghost; Lotus 123; Lotus
Notes; WordPerfect 7; Microsoft Visual Basic and Visual C++
LANGUAGES HTML, ASP, JavaScript,
VBScript, SQL, Visual C++, Visual BASIC
OPERATING Windows
NT/2000, Windows 95/98/ME
EXPERIENCE
Present Software Quality Assurance Engineer/Project Manager
·
Write
a QA test plan from functional specifications and design documents.
·
Execute
manual test scripts on a variety of platforms and document test results.
·
Follow
the bug tracking and escalation & reporting process.
·
Help
write the documentation for the project.
·
Collaborate
and coordinate tasks with the development and documentation staff.
·
Plan
and estimate development efforts for the next revision of the product.
May 2000 Medical Data Operator
·
Perform
data entry to maintain database(s).
·
Update
spreadsheets.
December 1999 Applied
Software Project Management, Project Team Leader
·
Recorded
Documentation.
·
Developed
Software Requirement Analysis.
·
Developed
Product Prospectus.
·
Developed
Life Cycle/Product Development Plan.
·
Developed
Product Design.
·
Developed
Product.
·
Developed
Product Installation/Training Plan.