CLICK TO ENLARGE

 

 

 

The Tri-power is closer to installing now.

You need to check all the carburetors linkage

And fuel lines and choke tubes.

 

Wrap the temperature sending unit with

Teflon tape and tighten it good,

 To ensure no leaks.

 

Install the PVC hose and the F connector.

 

Then don’t forget to silicone the water outlet

doughnut  to the intake.

 

CLICK NEXT

CLICK TO ENLARGE

CLICK TO ENLARGE

HOME       NEXT     BACK