|
CLICK TO ENLARGE |
The
Tri-power is closer to installing now. You
need to check all the carburetors linkage And fuel lines and choke tubes. |
|
Wrap
the temperature sending unit with Teflon tape and tighten it good, To ensure no leaks. Install
the PVC hose and the F connector. Then
don’t forget to silicone the water outlet doughnut to the intake. |
|
|
|
|