Train Crew Instructions

The intended crew size for an operating session includes four mainline operators. There are a variety of through trains, transfers with set out and pickup of blocks of cars, and trains with heavy local switching. This provides a good mix for operators. The operating sequence is divided into two "shifts". Only one shift is run at a session. Instructions for local switching are by the color and letter on the color-coded-tacks. Generally, once a car is delivered to an industry, it remains in place until the end of the second shift. Times are per a 4:1 fast clock.

Go to Train Crew Instructions. This is a WORD exported document (readable in Explorer, but doubtful in Netscape). Train Crews are given laminated 2 inch by 4 inch instructions from this file.


BH&BF Home Page | Mayfield Yard Instructions

For further information on the BH&BF, or to make any comments, please email me.
The URL for this page is: http://users.owt.com/prevette/trains.htm
Last Modified: June 14, 2003