|
7:00 AM DH-97 D&H
Transfer Engine: ___________ Max Train Length: ___________ Origination: D&H Track 5 1. Proceed Westbound on D&H from Sidney
Track 5. Arrive GX Tower, pull onto
BH&BF and back into Sidney. 2. At Sidney, RUN AROUND TRAIN. 3. Proceed Southbound on BH&BF to
Mayfield Coal Yard and terminate. |
7:00AM
282 EL Taylor Yard Transfer Engine: ___________ Max Train Length: ___________ Origination: EL Taylor Yard 1. Leave EL Taylor Yard. Arrive Cayuga Junction, (Big Flats)
continue on BH&BF Northbound. 2. Arrive Mayfield Main Yard and terminate. |
7:20 AM
321 Norwich -
Mayfield Transfer Engine: ______________ Max Train
Length: _______ Origination: Norwich Track 1 1. Leave
Norwich Southbound. 2. At
Sidney, drop any RED, YELLOW, and BLUE cars in Sidney Yard. Pickup any BLACK, BROWN, WHITE, SILVER, or
PINK cars from Sidney Yard as train length allows. 3. Proceed southbound to
Mayfield Coal Yard and terminate. |
|
7:30 AM
281T Big
Flats Mine Run Engine: 99 Max
Train Length: 9 Origination: Mayfield Coal Yd 1. Leave Mayfield Southbound 2. Setout and Pickup at Ontario Mine (O) and
Mason (MT, M). At Capouse Jct, take
Capouse Branch (right hand track). 3. At E-L Hampden yard deliver remaining
WHITE cars to EL and Big Flats industries; pickup Big Flats and E-L
outbounds. TURN TRAIN. 4.
Return to Mayfield Main Yard Northbound and drop all cars. 5. Pickup WHITE cars from Coal Yard and
original caboose and repeat. 8:20 AM 425C Utica
Coal (empties) Engine: ___________ Max Train Length: _______ Origination: Norwich Track 2 1. Leave Norwich Track 2 Southbound. 2. Proceed southbound to Mayfield Coal Yard
and terminate. 9:30 AM 292T Burnt
Hills Wayfreight Engine: ___________ Max Train Length: _______ Origination: Mayfield Main Yd NOTE: See town maps for setout and pickup instructions. 1. Leave Mayfield northbound. 2. Switch Cadosia and Burnt Hills northbound. 3. At Sidney Yard, drop all cars, turn
train. Pickup RED cars from Sidney
Yard, depart Southbound. 4. Switch South Unadilla, Burnt Hills, and
Cadosia southbound. 5. Arrive Mayfield Coal Yard and terminate. 11:30 AM
232 Mayfield - Norwich Transfer Engine: ___________ Max Train Length: _______ Origination: Mayfield Main Yd 1.
Leave Mayfield Main Yard Northbound. 2. At Sidney, drop any non-GREEN cars in
Sidney yard. Pickup GREEN cars from
Sidney Yard. 3.
Proceed northbound to Norwich (track 2). 1:00 PM 291T Northwest
Branch Mine Run Engine: ___________ Max Train Length: ___________ Origination: Mayfield Main Yd 1. Leave Mayfield Main Yard northbound 2. Arrive
Carbondale, pull forward to Northwest Junction and setout to Northwest Branch
(Pink 1,2,3 and T). NOTE: DO
NOT PUSH MORE THAN 4 EMPTIES AT A TIME ON THE BRANCH. 3. Pickup outbounds. TURN TRAIN. 4. Arrive Mayfield Coal Yard and terminate. 2:50 PM
SL-91 Syracuse-Lehigh Valley Through Engine: _____________ Max Train Length: _________ Origination: Norwich Track 3 1. Leave Norwich southbound. 2. Proceed to
Mayfield Coal Yard. Drop all cars
except BLACK LV. Pickup BLACK LV cars
from yard. 3. At Capouse Junction, take Capouse Branch. 4. Proceed to LV Coxton Yard (Sibley Main). 4:00 PM EL-86 EL Oswego Coal (Loads) Engine: ___________ Max Train Length: ___________ Origination: E-L Taylor Yard 1. Leave E-L Taylor Yard Northbound. Arrive Cayuga Junction (Big Flats),
continue on BH&BF Northbound 2. At
Mayfield Main Yard, drop non-GREEN O cars, pickup GREEN O (Oswego) cars as train length allows. 3. Proceed Northbound to Norwich (Track 1). 4:30 PM
286T Big Flats Mine Run Engine: ______ Max Train Length: ______ Origination: Mayfield Coal Yd 1.
Leave Mayfield Southbound 2. Setout and Pickup at Ontario Mine (O) and
Mason (MT, M). At Capouse Jct, take
Capouse Branch (right hand track) 3. At E-L
Hampden yard deliver remaining WHITE cars to EL and Big Flats industries;
pickup EL and Big Flats outbounds. TURN TRAIN. 4.
Return to Mayfield Main Yard Northbound and drop all cars. 5. Pickup WHITE cars from Coal Yard and
original caboose and repeat. 5:10 PM LVB-2 Lehigh Valley Transfer Engine: ___________ Max Train
Length: 10 Origination:
LV (Sibley Siding) 1. Leave LV
Coxton Yard northbound. 2. Proceed to
Mayfield Main Yard, drop all cars, turn engines (if needed). 3. Pickup BLACK
LV cars from Coal Yard, pickup same caboose as arrived with. 4. Proceed
Southbound to Capouse Junction. Take
Capouse Branch. 5.
Continue to LV Coxton Yard (Sibley Siding) 7:00 PM 285T
Scranton
Transfer Engine: 99
Max
Train Length: 9 Origination: Mayfield Coal Yd 1.
Leave
Mayfield southbound. 2.
At
Capouse Junction, stay on main to Scranton. 3.
At Scranton,
setout BROWN cars to L,F sidings and CNJ (1,2,3). Pickup outbound cars from these locations as train length
allows. 4.
TURN
TRAIN. Return to Mayfield Main Yard
Northbound. Drop all cars at Mayfield
Main Yard 5. If there are sufficient BROWN cars,
pickup BROWN cars from Coal Yard and original caboose and repeat. 9:20 PM
284 EL Taylor Yard Transfer Engine: ___________ Max Train Length: ___________ Origination: EL Taylor Yard 1.
Leave EL
Taylor Yard. Arrive Cayuga Junction,
(Big Flats) continue on BH&BF Northbound. 2. Arrive Mayfield Main Yard and
terminate. 11:00 PM DH-98 D&H Transfer Engine: ___________ Max Train Length: ___________ Origination: Mayfield Main Yd 1.
Leave
Mayfield Main Yard northbound with Blue DH (Delaware and Hudson). 2.
At Sidney, run around train. 3.
Back
through GX tower. 4. Proceed Eastbound on D&H (pull
forward, terminate on track 5). |
8:00 AM
MU-94 Mayfield
- Utica Through Engine: ___________ Max Train Length: ___________ Origination: Mayfield Main Yd 1. Leave Mayfield Main Yard northbound with
GREEN N,U (Norwich and Utica)
cars. 2. Arrive Norwich (Track 1). 8:50 AM LVB-1 Lehigh Valley Transfer Engine: ___________ Max Train
Length: 10 Origination:
LV (Sibley Siding) 1. Leave
LV Coxton Yard Northbound. 2. Proceed
to Mayfield Main Yard, drop all cars, turn engines (if needed). 3. Pickup
BLACK LV cars from Coal Yard, pickup same caboose as arrived with. 4. Proceed
Southbound to Capouse Junction. Take
Capouse Branch. 5.
Continue to LV Coxton Yard (Sibley Siding) 10:00AM 287 EL Taylor
Yard Transfer Engine: ___________ Max Train Length: _______ Origination: Mayfield Coal Yd 1. Leave Mayfield Coal Yard southbound. 2. At Capouse
Junction, take Capouse Branch (right hand track). 3. At Cayuga Junction, take E-L through
Hampden Yard. 4. Arrive Taylor Yard holding track (Pull
all the way to the end of track) and terminate. 12:15 PM
NE‑84 Washington
DC ‑ Portland ME "The
Alphabeter" Engine: ___________ Max Train Length: ___________ Origination: LV Sibley Main 1. Leave LV Coxton Yard northbound. 2. At
Mayfield Main Yard, setout all non‑BLUE cars. Pickup BLUE cars. 3. Proceed northbound to Sidney. Run around train, push train through GX
Tower. 4. Proceed forward (Eastbound) on D&H
(Track 5). 1:45 PM DH-95 D&H
Transfer Engine: ___________ Max Train Length: ___________ Origination: D&H Track 6 1. Proceed Westbound on D&H from Sidney
Track 6. Arrive GX Tower, pull onto
BH&BF and back into Sidney. 2. At Sidney, RUN AROUND TRAIN. 3. Proceed Southbound on BH&BF to
Mayfield Coal Yard and terminate. 3:00 PM
DH‑96 Delaware
& Hudson Transfer Engine: ___________ Max Train Length: _______ Origination: Mayfield Main Yd 1. Leave Mayfield Main Yard northbound with
cars for Delaware and Hudson. 2. At Sidney, RUN AROUND TRAIN. 3. Back through GX tower. 4. Proceed Eastbound on D&H (pull
forward, terminate on track 6). 4:30 PM 327 Norwich
- Mayfield Transfer Engine: ___________ Max Train Length: Origination: Norwich Track 2 1. Leave Norwich (Track 2) Southbound. 2. At Sidney,
drop any RED, YELLOW, or BLUE cars at Sidney Yard. Pickup BLACK, BROWN, WHITE, SILVER, or PINK cars from Sidney
Yard as train length allows. 3. Proceed southbound to Mayfield Coal Yard
and terminate. 4:55 PM UM-93 Utica
- Mayfield through. Engine: ___________ Max Train Length: ___________ Origination: Norwich Track 2 1. Leave Norwich (Track 2) southbound. 2. Arrive Mayfield Coal Yard and terminate. 6:00 PM
DH‑94 Delaware
& Hudson Transfer Engine: ___________ Max Train Length: _______ Origination: Mayfield Main Yd 1.
Leave
Mayfield Main Yard northbound. 2.
At
Sidney, RUN AROUND TRAIN. 3.
Back
through GX tower. 4. Proceed Eastbound on D&H (pull
forward, terminate on track 6). 8:10 PM LS-92 Lehigh
Valley to Syracuse Through Engine: ___________ Max Train Length: ___________ Origination: LV Sibley Main 1. Leave LV Coxton Yard (Sibley Main)
northbound. 2. Proceed to
Mayfield Main Yard, drop all non-GREEN S cars, pickup GREEN S (Syracuse)
cars as train length allows. 3. Proceed northbound to Norwich (Track 2) 9:50 PM NE‑87 Portland
ME to Washington DC "The
Alphabeter" Engine: ___________ Max Train Length: ___________ Origination: D&H Track 5 1.
Proceed
Westbound on D&H from Sidney Track 5.
Arrive GX Tower, pull onto BH&BF and back into Sidney. 2.
At
Sidney, RUN AROUND TRAIN. 3.
Proceed
Southbound on BH&BF. 4.
At
Mayfield Coal Yard, setout all cars except BLACK LV. Pickup BLACK LV cars from yard. Proceed Southbound. 5.
At
Capouse Jct, take Capouse Branch (right hand track), and proceed to LV Coxton
Yard (Sibley Main). 11:10 PM
384T Delhi
Branch Engine: ___________ Max Train Length: __________ Origination: Norwich Track 3 1. Leave Norwich southbound. 2. At Sidney,
drop off all cars, except YELLOW D cars.
Pickup YELLOW D (Delhi Branch) cars from Sidney Yard 3. Proceed to Burnt Hills. RUN AROUND TRAIN. 4. Proceed Northbound to Delhi Branch. |
8:10 AM
384T Delhi Branch Engine: ___________ Max Train
Length: _______ Origination:
Delhi Branch 1. Leave
Delhi Branch Southbound 2. Proceed to Burnt Hills. RUN AROUND TRAIN. Proceed Northbound. 3. At
Sidney, drop off all cars except YELLOW N cars at Sidney Yard. Pickup YELLOW N (northbound local)
cars from Sidney Yard. 4. Proceed
to Norwich (Track 1). 9:10 AM 329 Sidney Wayfreight Engine: ___________ Max Train
Length: _______ Origination:
Norwich Track 2 1. Leave Norwich
Track 2 Southbound. 2. At Sidney, sort Sidney
yard, deliver YELLOW cars from train and Sidney Yard to industries. Pickup all BLACK, WHITE, PINK, BROWN,
SILVER cars from Sidney industries. 3. Makeup train of
southbound BLACK, WHITE, PINK, BROWN, SILVER cars, as train length
allows. Leave any excess cars in
Sidney Yard. 4.
Proceed
to Mayfield Coal Yard and terminate. 11:00 AM 283T Scranton Transfer Engine: _________ Max Train Length: _________ Origination:
Mayfield Coal Yd 1. Leave
Mayfield Coal Yard southbound. 2. At Capouse
Junction, stay on main to Scranton (left hand track). 3. At
Scranton, setout BROWN cars to L, F sidings and CNJ (1,2,3). Pickup outbound cars from these locations
as train length allows. 4. Return
northbound to Mayfield Main Yard and terminate. 12:50 PM EL-81 EL - Oswego Coal Southbound Engine: ___________ Max Train Length: ___________
Origination: Norwich Track 3 1. Leave Norwich Southbound 2. At Mayfield
Coal Yard, drop non-EL cars. Pickup
BLACK EL (E-L Taylor Yard) coal hoppers. 3. Continue Southbound. At Capouse Junction, take Capouse Branch. 4. At Cayuga Junction, take
Erie-Lackawanna. Terminate in EL
Taylor Yard holding track. 2:30 PM MS-88 Mayfield - Syracuse Through Engine: ___________ Max Train Length: _______ Origination: Mayfield Main Yd 1.
Leave
Mayfield Main Yard Northbound with GREEN S (Syracuse) cars. 2.
Do not
proceed beyond Sidney prior to arrival of SL-91 from Norwich (Track 3) 3.
Proceed
to Norwich (Track 3). 4:00 PM DH-99 D&H
Transfer Engine: ___________ Max Train Length: ___________ Origination: D&H Track 6 1.
Proceed Westbound on D&H from Sidney Track
6. Arrive GX Tower, pull onto
BH&BF and back into Sidney. 2.
At
Sidney, run around train. 3.
Proceed
Southbound on BH&BF to Mayfield Coal Yard and terminate. 5:00 PM 238 Sidney Wayfreight Engine: ___________ Max Train Length: ___________ Origination: Mayfield Main Yd 1. Leave Mayfield Main
Yard Northbound with YELLOW (Sidney) cars. 2. At Sidney, sort Sidney
yard, deliver YELLOW cars to industries, pickup all outbound Sidney industry
cars and deliver to Sidney Yard. 3. Makeup train of YELLOW
N (Northbound Local) cars as train length allows. Leave excess in Sidney Yard. 4. Proceed Northbound to Norwich (Track 1). 6:30 PM 294 T Burnt Hills Wayfreight Engine: ___________ Max Train Length: _______ Origination: Mayfield Main Yd NOTE: See town maps for setout and pickup instructions. 1.
Leave
Mayfield Main Yard northbound. 2.
Switch
Cadosia and Burnt Hills northbound 3.
At Sidney Yard, drop all cars, turn train. Pickup RED cars from Yard and depart
Southbound. 4.
Switch
South Unadilla, Burnt Hills, and Cadosia southbound. 5. Terminate in Mayfield Coal Yard. 8:50 PM SM-89 Syracuse
- Mayfield through Engine: ___________ Max Train Length: ___________ Origination: Norwich Track 3 1. Leave Norwich (Track 3) southbound. 2. Arrive Mayfield Coal Yard and terminate. 10:00 PM
236
Mayfield
- Norwich Transfer Engine: ___________ Max Train Length: ___________ Origination: Mayfield Main Yd 1.
Leave Mayfield Main Yard Northbound. 2. At Sidney, drop any non-GREEN cars in Sidney yard. Pickup GREEN cars from Sidney Yard as train length allows. 3. Proceed northbound to Norwich (track 2). 11:30 PM 289 EL Taylor
Yard Transfer (Midnight
Shove) Engine: ___________ Max Train Length: _______ Origination: Mayfield Coal Yd 1. Leave Mayfield Coal Yard southbound with
BLACK EL (Erie Lackawanna Taylor Yard) cars. 2. At Capouse
Junction, take Capouse Branch (right hand track). 3. At Cayuga Junction, take E-L through
Hampden Yard. 4. Arrive Taylor Yard holding track and
terminate. |
|
11:55 PM 248C Utica
Coal (Loads) Engine: ___________ Max Train Length: _________ Origination: Mayfield Main Yd 1. Leave Mayfield Main Yard Northbound with
GREEN N and U (Norwich and Utica). 2. Arrive Norwich (Holding Track 3). Norwich Holding Track 1 IS EMPTY Pull incoming train all the way to the
end of the track and hang train card on this hook face down 12:30 PM
Extra Helper Engine: Coal Yard Switcher Max Train Length: N/A Origination: Mayfield Coal Yard 1.
Leave
Mayfield southbound. 2.
At Capouse Jct, pull into clear on main track (track
to Scranton). 3.
Once Train 2 passes through Capouse Jct, proceed on
to main as pusher. Proceed with Train
2 northbound. 4.
At
Mayfield uncouple from train and resume duties at Coal Yard |
Erie
Lackawanna Taylor
Yard
IS EMPTY Pull incoming train all the way to the
end of the track and hang train card on this hook face down Norwich Holding Track 2 IS EMPTY Pull incoming train all the way to the
end of the track and hang train card on this hook face down 4:20PM
1 Steamtown Fan Trip South Engine: NYOW 402
(42) Max Train Length: 4 passenger Origination: Norwich Track 1 1.
Leave
Norwich southbound. 2.
Wait 15 minutes at Burnt Hills station. 3.
Wait 15 minutes at Pleasant Mount station. 4.
Ensure
LVB-2 has arrived at Mayfield prior to leaving Mayfield 5. Proceed to LV Coxton Yard (Sibley Siding). |
Norwich Holding Track 3 IS EMPTY Pull incoming train all the way to the
end of the track and hang train card on this hook face down 4:20PM 1 Steamtown Fan Trip South Engine: NYOW 402
(42) Max Train Length: 4 passenger Origination: Norwich Track 1 6.
Leave
Norwich southbound. 7.
Wait 15 minutes at Burnt Hills station. 8.
Wait 15 minutes at Pleasant Mount station. 9.
Ensure
LVB-2 has arrived at Mayfield prior to leaving Mayfield 10. Proceed to LV Coxton Yard (Sibley Siding). 1:00PM
2 Steamtown Fan Trip North Engine: NYOW 402
(42) Max Train Length: 4 passenger Origination: Sibley Main 1.
Leave
from Sibley Main northbound. 2.
At
Capouse Jct, receive helper. 3.
At
Mayfield drop off helper 4. Wait
15 minutes at Pleasant Mount station. 5. Wait
15 minutes Burnt Hills station. 6.
Proceed
to Norwich (Holding Track 2) |