7:00 AM                   DH-97

 

D&H Transfer

 

Engine:                     ___________

Max Train Length:   ___________

Origination:              D&H Track 5

 

1.  Proceed Westbound on D&H from Sidney Track 5.  Arrive GX Tower, pull onto BH&BF and back into Sidney.

 

2.  At Sidney, RUN AROUND TRAIN.

 

3.  Proceed Southbound on BH&BF to Mayfield Coal Yard and terminate.

 

 

 

 

 

7:00AM                            282

 

EL Taylor Yard Transfer

 

Engine:                     ___________

Max Train Length:   ___________

Origination:          EL Taylor Yard

 

1.  Leave EL Taylor Yard.  Arrive Cayuga Junction, (Big Flats) continue on BH&BF Northbound.

 

2.  Arrive Mayfield Main Yard and terminate.

 

 

7:20 AM                              321

 

Norwich - Mayfield Transfer

Engine:            ______________

Max Train Length:      _______

Origination:      Norwich Track 1

1.  Leave Norwich Southbound.

 

2.  At Sidney, drop any RED, YELLOW, and BLUE cars in Sidney Yard.  Pickup any BLACK, BROWN, WHITE, SILVER, or PINK cars from Sidney Yard as train length allows.

 

3.  Proceed southbound to Mayfield Coal Yard and terminate.

 

 

7:30 AM                             281T

 

Big Flats Mine Run

Engine:                                 99      

Max Train Length:               9      

Origination:     Mayfield Coal Yd

 

1.  Leave Mayfield Southbound

 

2.  Setout and Pickup at Ontario Mine (O) and Mason (MT, M).  At Capouse Jct, take Capouse Branch (right hand track).

 

3.  At E-L Hampden yard deliver remaining WHITE cars to EL and Big Flats industries; pickup Big Flats and E-L outbounds. TURN TRAIN.

 

4. Return to Mayfield Main Yard Northbound and drop all cars.

5.  Pickup WHITE cars from Coal Yard and original caboose and repeat.

 

 

8:20 AM                      425C

 

Utica Coal (empties)

 

Engine:                      ___________

Max Train Length:            _______

Origination:         Norwich Track 2

 

1.  Leave Norwich Track 2 Southbound.

 

2.  Proceed southbound to Mayfield Coal Yard and terminate.

 

 

 

 

 

 

 

 

 

9:30 AM                         292T

Burnt Hills

Wayfreight

Engine:                      ___________

Max Train Length:            _______

Origination:       Mayfield Main Yd

NOTE: See town maps for setout and pickup instructions.

1.  Leave Mayfield northbound.

 

2.  Switch Cadosia and Burnt Hills northbound.

 

3.  At Sidney Yard, drop all cars, turn train.  Pickup RED cars from Sidney Yard, depart Southbound.

 

4.  Switch South Unadilla, Burnt Hills, and Cadosia southbound.

 

5.  Arrive Mayfield Coal Yard and terminate.

 

 

11:30 AM                             232

 

Mayfield - Norwich Transfer

Engine:             ___________

Max Train Length:   _______

Origination:    Mayfield Main Yd

1. Leave Mayfield Main Yard Northbound.

 

2.  At Sidney, drop any non-GREEN cars in Sidney yard.  Pickup GREEN cars from Sidney Yard.

 

3.  Proceed northbound to Norwich

(track 2).

 

 

 

 

 

 

 

 

1:00 PM                           291T Northwest Branch Mine Run

Engine:                     ___________

Max Train Length:   ___________

Origination:      Mayfield Main Yd

 

1.  Leave Mayfield Main Yard northbound

 

2.  Arrive Carbondale, pull forward to Northwest Junction and setout to Northwest Branch (Pink 1,2,3 and T).  NOTE: DO NOT PUSH MORE THAN 4 EMPTIES AT A TIME ON THE BRANCH.

 

3.  Pickup outbounds.  TURN TRAIN.

 

4.  Arrive Mayfield Coal Yard and terminate.

 

 

2:50 PM                           SL-91

 

Syracuse-Lehigh Valley Through

Engine:             _____________

Max Train Length:   _________

Origination:    Norwich Track 3

1.  Leave Norwich southbound.

 

2.  Proceed to Mayfield Coal Yard.  Drop all cars except BLACK LV.  Pickup BLACK LV cars from yard.

 

3.  At Capouse Junction, take Capouse Branch.

 

4.  Proceed to LV Coxton Yard

 (Sibley Main).

 

 

 

 

4:00 PM                           EL-86

EL Oswego Coal (Loads)

Engine:                      ___________

Max Train Length:    ___________

Origination:          E-L Taylor Yard

1.  Leave E-L Taylor Yard Northbound.  Arrive Cayuga Junction (Big Flats), continue on BH&BF Northbound

 

2.  At Mayfield Main Yard, drop non-GREEN O cars, pickup GREEN O (Oswego)  cars as train length allows.

 

3.  Proceed Northbound to Norwich

 (Track 1).

 

 

 

 

 

4:30 PM                             286T

 

Big Flats Mine Run

Engine:                           ______   

Max Train Length:       ______   

Origination:     Mayfield Coal Yd

 

1.  Leave Mayfield Southbound

 

2.  Setout and Pickup at Ontario Mine (O) and Mason (MT, M).  At Capouse Jct, take Capouse Branch (right hand track)

 

3.  At E-L Hampden yard deliver remaining WHITE cars to EL and Big Flats industries; pickup EL and Big Flats outbounds. TURN TRAIN.

4. Return to Mayfield Main Yard Northbound and drop all cars.

5.  Pickup WHITE cars from Coal Yard and original caboose and repeat.

5:10 PM                         LVB-2

 

Lehigh Valley Transfer

Engine:                      ___________

Max Train Length:                    10        

Origination:      LV (Sibley Siding)

 

1.       Leave LV Coxton Yard northbound.

 

2.       Proceed to Mayfield Main Yard, drop all cars, turn engines (if needed).

 

3.       Pickup BLACK LV cars from Coal Yard, pickup same caboose as arrived with.

 

4.       Proceed Southbound to Capouse Junction.  Take Capouse Branch.

 

5.       Continue to LV Coxton Yard (Sibley Siding)

 

 

 

7:00 PM                       285T

 

Scranton Transfer

 

Engine:                                         99   

Max Train Length:                       9   

Origination:     Mayfield Coal Yd

 

1.       Leave Mayfield southbound.

2.       At Capouse Junction, stay on main to Scranton.

3.       At Scranton, setout BROWN cars to L,F sidings and CNJ (1,2,3).  Pickup outbound cars from these locations as train length allows.

4.       TURN TRAIN.  Return to Mayfield Main Yard Northbound.  Drop all cars at Mayfield Main Yard

5.       If there are sufficient BROWN cars, pickup BROWN cars from Coal Yard and original caboose and repeat.

 

 

 

9:20 PM                           284

 

EL Taylor Yard Transfer

 

Engine:                     ___________

Max Train Length:   ___________

Origination:          EL Taylor Yard

 

1.       Leave EL Taylor Yard.  Arrive Cayuga Junction, (Big Flats) continue on BH&BF Northbound.

 

2.       Arrive Mayfield Main Yard and terminate.

 

 

 

 

 

 

 

 

11:00 PM                     DH-98

 

D&H Transfer

 

Engine:                     ___________

Max Train Length:   ___________

Origination:        Mayfield Main Yd

 

1.       Leave Mayfield Main Yard northbound with Blue DH (Delaware and Hudson).

 

2.       At Sidney, run around train. 

 

3.       Back through GX tower.

 

4.       Proceed Eastbound on D&H (pull forward, terminate on track 5).

 

 

 

 

 

 

8:00 AM                      MU-94

 

Mayfield - Utica Through

 

Engine:                     ___________

Max Train Length:   ___________

Origination:      Mayfield Main Yd

 

1.  Leave Mayfield Main Yard northbound with GREEN N,U (Norwich and Utica)  cars.

 

2.  Arrive Norwich (Track 1).

 

 

 

 

 

 

 

 

8:50 AM                         LVB-1

 

Lehigh Valley Transfer

 

Engine:                      ___________

Max Train Length:                    10        

Origination:      LV (Sibley Siding)

 

1.  Leave LV Coxton Yard Northbound.

 

2.  Proceed to Mayfield Main Yard, drop all cars, turn engines (if needed).

 

3.  Pickup BLACK LV cars from Coal Yard, pickup same caboose as arrived with.

 

4.  Proceed Southbound to Capouse Junction.  Take Capouse Branch.

 

5.  Continue to LV Coxton Yard (Sibley Siding)

 

 

10:00AM                              287

 

EL Taylor Yard Transfer

 

Engine:                      ___________

Max Train Length:            _______

Origination:       Mayfield Coal Yd

 

1.  Leave Mayfield Coal Yard southbound.

 

2.  At Capouse Junction, take Capouse Branch (right hand track).

 

3.  At Cayuga Junction, take E-L through Hampden Yard.

 

4.  Arrive Taylor Yard holding track (Pull all the way to the end of track) and terminate.

 

 

 

 

12:15 PM                        NE‑84

 

Washington DC ‑ Portland ME    

"The Alphabeter"

 

Engine:                     ___________

Max Train Length:   ___________

Origination:          LV Sibley Main

 

1.  Leave LV Coxton Yard northbound.

 

2.  At Mayfield Main Yard, setout all non‑BLUE cars.  Pickup BLUE cars.

 

3.  Proceed northbound to Sidney.  Run around train, push train through GX Tower.

 

4.  Proceed forward (Eastbound) on D&H (Track 5).

 

 

1:45 PM                   DH-95

 

D&H Transfer

 

Engine:                     ___________

Max Train Length:   ___________

Origination:              D&H Track 6

 

1.  Proceed Westbound on D&H from Sidney Track 6.  Arrive GX Tower, pull onto BH&BF and back into Sidney.

 

2.  At Sidney, RUN AROUND TRAIN.

 

3.  Proceed Southbound on BH&BF to Mayfield Coal Yard and terminate.

 

 

 

 

 

 

3:00 PM                        DH‑96 

 

Delaware & Hudson Transfer

 

Engine:                   ___________

Max Train Length:         _______

Origination:    Mayfield Main Yd

1.  Leave Mayfield Main Yard northbound with cars for Delaware and Hudson.

 

2.  At Sidney, RUN AROUND TRAIN. 

 

3.  Back through GX tower.

 

4.  Proceed Eastbound on D&H (pull forward, terminate on track 6).

 

 

 

 

 

 

4:30 PM                           327

 

Norwich - Mayfield Transfer

 

Engine:                      ___________

Max Train Length:                          Origination:         Norwich Track 2

 

1.  Leave Norwich (Track 2) Southbound.

 

2.  At Sidney, drop any RED, YELLOW, or BLUE cars at Sidney Yard.  Pickup BLACK, BROWN, WHITE, SILVER, or PINK cars from Sidney Yard as train length allows.

 

3.  Proceed southbound to Mayfield Coal Yard and terminate.

 

 

 

 

 

4:55 PM                     UM-93 

 

Utica - Mayfield through.

 

Engine:                     ___________

Max Train Length:   ___________

Origination:          Norwich Track 2

 

1.  Leave Norwich (Track 2) southbound.

 

2.  Arrive Mayfield Coal Yard and terminate.

 

 

 

 

 

 

 

 

 

 

 

6:00 PM                        DH‑94 

 

Delaware & Hudson Transfer

 

Engine:                   ___________

Max Train Length:         _______

Origination:    Mayfield Main Yd

1.       Leave Mayfield Main Yard northbound.

 

2.       At Sidney, RUN AROUND TRAIN. 

 

3.       Back through GX tower.

 

4.       Proceed Eastbound on D&H (pull forward, terminate on track 6).

 

 

 

 

 

8:10 PM                      LS-92

 

Lehigh Valley to Syracuse Through

 

Engine:                      ___________

Max Train Length:    ___________

Origination:           LV Sibley Main

 

1.  Leave LV Coxton Yard (Sibley Main) northbound.

 

2.  Proceed to Mayfield Main Yard, drop all non-GREEN S cars, pickup GREEN S (Syracuse) cars as train length allows.

 

3.  Proceed northbound to Norwich

 (Track 2)

 

 

 

 

 

 

9:50 PM                        NE‑87  

 

Portland ME to Washington DC

"The Alphabeter"

Engine:                     ___________

Max Train Length:   ___________

Origination:             D&H Track 5

1.       Proceed Westbound on D&H from Sidney Track 5.  Arrive GX Tower, pull onto BH&BF and back into Sidney.

 

2.       At Sidney, RUN AROUND TRAIN.

3.       Proceed Southbound on BH&BF.

 

4.       At Mayfield Coal Yard, setout all cars except BLACK LV.  Pickup BLACK LV cars from yard.  Proceed Southbound.

 

5.       At Capouse Jct, take Capouse Branch (right hand track), and proceed to LV Coxton Yard (Sibley Main).

 

 

11:10 PM                           384T

 

Delhi Branch

 

Engine:                      ___________

Max Train Length:    __________                       

Origination:        Norwich Track 3

 

1.  Leave Norwich southbound.

 

2.  At Sidney, drop off all cars, except YELLOW D cars.  Pickup YELLOW D (Delhi Branch) cars from Sidney Yard

 

3.  Proceed to Burnt Hills.  RUN AROUND TRAIN.

 

4.  Proceed Northbound to Delhi Branch.

 

 

 

 

8:10 AM                            384T

 

Delhi Branch

Engine:             ___________

Max Train Length:   _______

Origination:       Delhi Branch

 

1.  Leave Delhi Branch Southbound

 

2. Proceed to Burnt Hills.

RUN AROUND TRAIN. Proceed Northbound.

 

3.  At Sidney, drop off all cars except YELLOW N cars at Sidney Yard.  Pickup YELLOW N (northbound local) cars from Sidney Yard.

 

4.  Proceed to Norwich (Track 1).

 

 

9:10 AM                         329

Sidney Wayfreight

 

Engine:                      ___________

Max Train Length:          _______                

Origination:      Norwich Track 2

 

1.       Leave Norwich Track 2 Southbound.

 

2.       At Sidney, sort Sidney yard, deliver YELLOW cars from train and Sidney Yard to industries.  Pickup all BLACK, WHITE, PINK, BROWN, SILVER cars from Sidney industries.

 

3.       Makeup train of southbound BLACK, WHITE, PINK, BROWN, SILVER cars, as train length allows.  Leave any excess cars in Sidney Yard.

 

4.       Proceed to Mayfield Coal Yard and terminate.

 

11:00 AM                      283T

 

Scranton Transfer

 

Engine:                       _________

                

Max Train Length:    _________

 

Origination:     Mayfield Coal Yd

 

1.  Leave Mayfield Coal Yard southbound.

 

2.  At Capouse Junction, stay on main to Scranton (left hand track).

 

3.  At Scranton, setout BROWN cars to L, F sidings and CNJ (1,2,3).  Pickup outbound cars from these locations as train length allows.

 

4.  Return northbound to Mayfield Main Yard and terminate.

 

 

 

12:50 PM                       EL-81 EL - Oswego Coal Southbound

Engine:                     ___________

Max Train Length:   ___________

Origination:         Norwich Track 3

 

1.  Leave Norwich Southbound

 

2.  At Mayfield Coal Yard, drop non-EL cars.  Pickup BLACK EL (E-L Taylor Yard) coal hoppers.

 

3.  Continue Southbound.  At Capouse Junction, take Capouse Branch.

 

4.  At Cayuga Junction, take Erie-Lackawanna.  Terminate in EL Taylor Yard holding track.

 

 

 

2:30 PM                      MS-88

 

Mayfield - Syracuse Through

 

Engine:                      ___________

Max Train Length:            _______

Origination:        Mayfield Main Yd

 

1.       Leave Mayfield Main Yard Northbound with GREEN S (Syracuse) cars.

 

2.       Do not proceed beyond Sidney prior to arrival of SL-91 from Norwich (Track 3)

 

3.       Proceed to Norwich (Track 3).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4:00 PM                      DH-99

 

D&H Transfer

 

Engine:                      ___________

Max Train Length:    ___________

Origination:              D&H Track 6

 

1.       Proceed Westbound on D&H from Sidney Track 6.  Arrive GX Tower, pull onto BH&BF and back into Sidney.

 

2.       At Sidney, run around train. 

 

3.       Proceed Southbound on BH&BF to Mayfield Coal Yard and terminate.

 

 

 

 

5:00 PM                          238

 

Sidney Wayfreight

 

Engine:                      ___________

Max Train Length:   ___________                      

Origination:       Mayfield Main Yd

 

1.       Leave Mayfield Main Yard Northbound with YELLOW (Sidney) cars.

 

2.       At Sidney, sort Sidney yard, deliver YELLOW cars to industries, pickup all outbound Sidney industry cars and deliver to Sidney Yard.

 

3.       Makeup train of YELLOW N (Northbound Local) cars as train length allows.  Leave excess in Sidney Yard.

 

4.     Proceed Northbound to Norwich

 (Track 1).

 

6:30 PM                           294 T Burnt Hills Wayfreight

Engine:                           ___________

Max Train Length:            _______

Origination:       Mayfield Main Yd

NOTE: See town maps for setout and pickup instructions.

1.       Leave Mayfield Main Yard northbound.

 

2.       Switch Cadosia and Burnt Hills northbound

 

3.       At Sidney Yard, drop all cars, turn train.  Pickup RED cars from Yard and depart Southbound.

 

4.       Switch South Unadilla, Burnt Hills, and Cadosia southbound.

 

5.       Terminate in Mayfield Coal Yard.

 

 

8:50 PM                  SM-89

 

Syracuse - Mayfield through

 

Engine:                      ___________

Max Train Length:    ___________

Origination:         Norwich Track 3

 

1.  Leave Norwich (Track 3) southbound.

 

2.  Arrive Mayfield Coal Yard and terminate.

 

 

 

 

 

 

 

10:00 PM                              236

 

Mayfield - Norwich Transfer

 

Engine:                      ___________

Max Train Length:    ___________

Origination:       Mayfield Main Yd

 

1. Leave Mayfield Main Yard Northbound.

 

2.  At Sidney, drop any non-GREEN cars in Sidney yard.  Pickup GREEN cars from Sidney Yard as train length allows.

 

3.  Proceed northbound to Norwich

 (track 2).

 

 

 

 

 

11:30 PM                             289

EL Taylor Yard Transfer

(Midnight Shove)

 

Engine:                      ___________

Max Train Length:            _______

Origination:       Mayfield Coal Yd

 

1.  Leave Mayfield Coal Yard southbound with BLACK EL (Erie Lackawanna Taylor Yard) cars.

 

2.  At Capouse Junction, take Capouse Branch (right hand track).

 

3.  At Cayuga Junction, take E-L through Hampden Yard.

 

4.  Arrive Taylor Yard holding track and terminate.

 

11:55 PM                          248C

 

Utica Coal (Loads)

 

Engine:                      ___________

Max Train Length:      _________                     

Origination:       Mayfield Main Yd

 

1.  Leave Mayfield Main Yard Northbound with GREEN N and U (Norwich and Utica).

 

2.       Arrive Norwich (Holding Track 3).

 

 

 

 

 

 

 

 

 

 

 

 

Norwich Holding Track

 

1

 

 

IS EMPTY

 

 

 

Pull incoming train all the way to the end of the track and hang train card on this hook face down

 

 

 

 

 

 

12:30 PM                          Extra

 

Helper

Engine:            Coal Yard Switcher

Max Train Length:  N/A

Origination:    Mayfield Coal Yard

1.       Leave Mayfield southbound.

 

2.       At Capouse Jct, pull into clear on main track (track to Scranton).

 

3.       Once Train 2 passes through Capouse Jct, proceed on to main as pusher.  Proceed with Train 2 northbound.

 

4.       At Mayfield uncouple from train and resume duties at Coal Yard

 

 

 

Erie Lackawanna

Taylor Yard

 

 

IS EMPTY

 

Pull incoming train all the way to the end of the track and hang train card on this hook face down

 

 

 

Norwich Holding Track

 

2

 

 

IS EMPTY

 

 

 

Pull incoming train all the way to the end of the track and hang train card on this hook face down

 

 

 

 

 

 

4:20PM                           1

 

Steamtown Fan Trip South

Engine:            NYOW 402  (42)

Max Train Length:   4 passenger

Origination:    Norwich Track 1

1.       Leave Norwich southbound.

 

2.       Wait 15 minutes at Burnt Hills station.

 

3.       Wait 15 minutes at Pleasant Mount station.

 

4.       Ensure LVB-2 has arrived at Mayfield prior to leaving Mayfield

 

5.       Proceed to LV Coxton Yard  (Sibley Siding).

 

 

 

 

 

Norwich Holding Track

 

3

 

 

IS EMPTY

 

 

 

Pull incoming train all the way to the end of the track and hang train card on this hook face down

 

 

 

 

 

 

4:20PM                           1

 

Steamtown Fan Trip South

Engine:            NYOW 402  (42)

Max Train Length:   4 passenger

Origination:    Norwich Track 1

6.       Leave Norwich southbound.

 

7.       Wait 15 minutes at Burnt Hills station.

8.       Wait 15 minutes at Pleasant Mount station.

 

9.       Ensure LVB-2 has arrived at Mayfield prior to leaving Mayfield

 

10.   Proceed to LV Coxton Yard  (Sibley Siding).

 

 

 

 

 

1:00PM                           2

 

Steamtown Fan Trip North

Engine:            NYOW 402  (42)

Max Train Length:   4 passenger

Origination:    Sibley Main

1.       Leave from Sibley Main northbound.

 

2.       At Capouse Jct, receive helper.

 

3.       At Mayfield drop off helper

 

4.       Wait 15 minutes at Pleasant Mount station.

 

5.       Wait 15 minutes Burnt Hills station.

 

6.       Proceed to Norwich (Holding Track 2)