Back to the first page.

A little bit about what RIMS means.
My present brewing system configuration.
The converted kegs.
The magnetically coupled pump.
The plumbing.
The propane burners.
Some miscellaneous equipment.
A look at the equipment I used before I built the RIMS.

Description of how the system is operated.
I'll try to anticipate some of your questions.
Data from an actual batch.
Other stuff I do with malt.

Credits to those that helped me build this contraption.

A little bit about me.

Download a copy of this webpage for offline reading. About 702Kbytes

"Woody"