
06-01-03 Trip to Warsaw, In. to get the car (8 Pics)
11-02-03 Car is transported to Kalamazoo, MI (1 Pic)
11-08-03 Car is gutted and Engine is removed (6 Pics)
11-20-03 Rear suspension is removed (4 Pics)
12-10-03 Floors are repaired, frame rails repainted (10 Pics)
12-28-03 Rebuilt 355 ci SBC is brought home (3 Pics)
01-02-04 Suspension parts are restored (3 Pics)
01-10-04 Front suspension is dropped (4 Pics)
02-17-04 Suspension is reinstalled (4 Pics)
02-29-04 Final assembly of engine (11 Pics)
03-14-04 Engine is installed! (13 Pics)
04-14-04 Interior gets painted and custom dashboard (7 Pics)
04-25-04 Major changes in the front trunk compartment (16 Pics)
05-16-04 Water pipes made (1 Pic)
05-16-04 Disk brake kit installed (1 Pic)
05-16-04 Electric Diffy Lube Pump Installed (4 Pics)
11-27-04 Body is stripped for body work (9 Pics)
11-28-04 Shaving the drip rails (16 Pics)
12-12-04 Body gets stripped to bare metal (10 Pics)
12-18-04 Official body work begins (15 Pics)
12-29-04 Custom hidden trailer hitch is fabricated/installed (14 pics)
04-03-05 Custom Dash is fabricated (7 pics)![]()
04-03-05 Custom Interior Begins with
Flamed Door Panels!...(7
pics)![]()
04-03-05 More Body Work...(4 pics)![]()