06-01-03  Trip to Warsaw, In. to get the car (8 Pics)

11-02-03 Car is transported to Kalamazoo, MI (1 Pic)

11-08-03 Car is gutted and Engine is removed (6 Pics)

11-20-03 Rear suspension is removed (4 Pics)

12-10-03 Floors are repaired, frame rails repainted (10 Pics)

12-28-03 Rebuilt 355 ci SBC is brought home (3 Pics)

01-02-04 Suspension parts are restored (3 Pics)

01-10-04 Front suspension is dropped (4 Pics)

02-17-04 Suspension is reinstalled (4 Pics)

02-29-04 Final assembly of engine (11 Pics)

03-14-04 Engine is installed! (13 Pics)

04-14-04 Interior gets painted and custom dashboard (7 Pics)

04-25-04 Major changes in the front trunk compartment (16 Pics)

05-16-04 Water pipes made (1 Pic)

05-16-04 Disk brake kit installed (1 Pic)

05-16-04 Electric Diffy Lube Pump Installed (4 Pics)

11-27-04 Body is stripped for body work (9 Pics)

11-28-04 Shaving the drip rails (16 Pics)

12-12-04 Body gets stripped to bare metal (10 Pics)

12-18-04 Official body work begins (15 Pics)

12-29-04 Custom hidden trailer hitch is fabricated/installed (14 pics)

04-03-05 Custom Dash is fabricated (7 pics)

04-03-05 Custom Interior Begins with Flamed Door Panels!...(7 pics)

04-03-05 More Body Work...(4 pics)

04-17-05 New Sheet Metal Work (13 pics)